Aventis Pharmaceutical Plant, Singapore

AMEC Foster Wheeler Asia Pacific Pte. Ltd. was appointed by Aventis Pharma Manufacturing Pte. Ltd. (Project Owner/Developer) to design and build major changes to the existing plant at Gul Circle, Singapore. The project involves additional new tanks, pipe racks and bund walls to the existing tank farm.

CKMbT was appointed as the civil and structural consultant for this project. As project’s Qualified Person (QP) and Professional Engineers (PE), CKMbT reviewed the engineering plans, submission forms, design calculations, documents etc. and made submissions to all relevant Authorities (URA, ENVCBPU, BCA, FSSD, LTA, NParks, PUB, etc.). CKMbT’s scope of works includes pre-consultations, meetings and liaising with all relevant Authorities until all DC, BP, TOP and CSC clearances and approvals are obtained.

The key challenge in this project was developing a design complying with current regulations while considering the serious constraints of a plant built to previous versions of regulations.

CLIENT
AMEC Foster Wheeler Asia Pacific Pte. Ltd.

LOCATION
Singapore

PROJECT START & END DATE
June 2016 –  In progress

TYPE OF SERVICE
Detailed Engineering, Construction Support